Every new flooring installation begins the same way – carefully measuring the floor plan to ensure accurate dimensions. Next, we remove the current flooring carefully so as not to damage the subsurface or baseboards.
Once the floor is prepped for the new installation, Adams Concrete & Construction PGH brings in your flooring of choice and begins the installation process. It’s installed according to manufacturer recommendation and in a way that ensures long-term life and decades of regular use.
Thanks for stopping by! We’re here to help, please don’t hesitate to reach out.